Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage Pipeline, Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Construction, Installation and Repairing of Jacket, Platform and Ancillary Facility
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage Pipeline, Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Construction, Installation and Repairing of Jacket, Platform and Ancillary Facility
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Industry Trends
How is the Submarine Cable Laid? (2)
How is the submarine cable routed? The submarine cable line layout consists of two parts: the collector line connection and the Submarine Cable Laying.
Read More >
How is the Submarine Cable Laid? (1)
With the gradual development of terrestrial high-quality wind energy resources, offshore wind power as a development trend is foreseeable in the future.
Read More >
Wenzhou Nanji Island Connects To National Grid
Nanji Island, Pingyang County, Wenzhou, Zhejiang, was one of the first five national marine nature reserves in China, but it was also the last formed town in Zhejiang Province that did not have access to the national grid.
Read More >
Protecting Subsea Cabling
The energy industry is changing. Renewables are on the rise and wind energy is becoming increasingly prevalent. In fact, Britain is set to increase the amount of energy produced from offshore wind farms from 7% to 30% over the next decade.
Read More >
Subsea 7 awarded contract offshore China
Subsea 7 today announced the award of a sizeable(1) contract by Offshore Oil Engineering Co. (COOEC), for CNOOC’s Lingshui 17-2 Gas Field Development Project - Steel Catenary Risers Installation Services. The field is located in the South China Sea approximately 150km o...
Read More >
Previous
1
2
...
38
39
40
41
Next