[email protected]
+86 22 6670 4393
Aug 28, 2026
Thorough Inspection and Maintenance, Ready for the Next Mission
Following the completion of the core equipment upgrade in June, the TIAN YI 601 engineering barge entered dry dock as scheduled on August 10 for hull inspection, equipment calibration, and specialized maintenance.
View More >
Aug 14, 2026
TIMEAST Successfully Completes 2026 Annual Management System Audit
TIMEAST successfully passed the annual surveillance audit conducted by DNV on August 6–7 for its ISO 9001, 14001, and 45001 management systems, which reviewed operational quality and improvement effectiveness.
Jul 15, 2026
Saving Lives When Every Second Counts! Timeast Participates in CPR and AED Certification Training
Recently, Timeast organized employees to attend CPR and AED certification training hosted by the Tianjin Red Cross Society at Dongli Huaming Science and Technology Innovation Park, strengthening their practical first-aid and emergency response skills.
Jun 10, 2026
TIAN YI 601 Engineering Barge Upgraded
Recently, TIAN YI 601 engineering barge successfully completed upgrades to its core equipment, integrated system commissioning and operational testing.
May 13, 2026
Gather Strength at the Forefront of Pipeline Industry, Empower the Development of Offshore Engineering
The 14th China (Langfang) Interpipe Expo was successfully held from April 22 to 24. Centering on the theme of "Intelligence·Green·Integration", Timeast was invited to attend the exposition.