Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post-Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Excavator
SE-18000 Excavator
Submarine/Offshore Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post-Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Excavator
SE-18000 Excavator
Submarine/Offshore Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Our Services
>>
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Jidong Nanpu 1-29 Gas Storage Pilot Test Ground Engineering Injection Acquisition and Gathering Pipeline Project Lay Barge Construction Project (Year 2022— CNPC
Providing S-Lay Barge TIAN YI 601 as the main operation vessel for 3.31km pipeline laying, 1 riser and spool installation, 3.31km post-trenching.
View More
Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)
Obtaining the land use right for site, and site construction according to the requirements of floating pulling and welding; installing and removing the position steel pipe of 10.91Km route; positioning and installing of 10.91km pipeline, offshore tie-in of, including connection with directional dr...
View More
NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project-Submarine Pipeline Shore Approach Laying Project (Year 2022— CNPC)
The project is located in about 30km east of Benin COTONOU Port in West Africa. Two parallel pipelines of about 14.4km long will be laid from the landing end to the sea side. The offshore terminal is a single point mooring system of CALM type.
View More
Yuedong Oil Field Offshore Pipeline Exposing & Suspending Repairing Project (Year 2021—Tincy Energy Group)
Handling relevant construction procedures; Diving check of pipeline suspending and exposing state and specific pipeline length in Yuedong oil field repairing section; Main operation vessel accurate positioning and fasten each mooring rope; Carrying out sandbag throwing construction work, offsho...
View More
Chenghai 1-1 Platform Submarine Pipeline Laying Project (Year 2021 -- CNPC)
Offshore pipeline pre-trenching, pipeline laying, riser and expansion bend, post-trenching, sandbag backfilling, bulk bags ballast, backfilling with excavated material, platform riser and pipeline sinking construction.
View More
Previous
1
2
3
4
Next