Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Press >> News

Business Meeting with the Engineering Design Institute of CNPC Offshore Engineering Co., Ltd

Mar. 15, 2024


March 12th, Mr. Shi Changwei, Director of Engineering Structure Institute of CNPC Engineering Design Institute, Mr. Sun Jinliang, Director of Tianjin Project Department, and Mr.Hu Zhihui, submarine pipeline expert, were invited to visit our company for cooperation communication.


Business Meeting with the Engineering Design Institute of  CNPC Offshore Engineering Co., Ltd


The Engineering Design Institute of CNPC Offshore Engineering Co., Ltd. (CNPC Overseas Ocean Engineering Technology Center), founded in 2005, is a professional Marine engineering design research and technical support unit of CNPC at home and abroad. Which engaged in feasibility study, basic design and detailed design of offshore oil and gas field exploration and development drilling engineering and offshore development engineering; design and technical support of offshore oil engineering operation; project management, on-site supervision and whole-process consulting service; engineering EPC general contracting business, etc. With the class A design, grade 1 general contracting qualification and engineering consulting class A qualification in offshore oil industry .


The two parties exchanged views on the development status and future trends of offshore oil and gas field development, infrastructure, offshore wind power and offshore engineering at home and abroad. Both sides hope to give full play to their respective advantages, jointly promote the development of Marine undertakings and achieve win-win cooperation in the future.


Timeast focus on submarine pipeline laying business from the foundation, through years of efforts, our footprint spread not only all the sea areas in China but also other countries in Africa and Asia such as Indonesia, Philippines, Bangladesh, Tanzania and Benin etc. The main business includes: submarine oil & gas pipeline laying and repairing; submarine water transportation & drainage pipeline laying and repairing; submarine cable/optical cable laying; submarine pipeline landing; construction, and installation of Jacket, platform and ancillary facility; submarine pipeline pre/post trenching.