Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Project Case

​CNOOC Pinghu Oil Field Pipeline Repairing Project (Year 2002)

Apr. 24, 2002

Project Introduction: Pipeline suspending and cracking caused by tide flush, Timeast was invited to perform pipeline repairing work.


CNOOC Pinghu Oil Field Pipeline Repairing Project (Year 2002)