[email protected]
+86 22 6670 4393
Project Introduction: The subsea pipeline was exposed and pending due to tide flushing, effective method was necessary to ensure pipeline safety.
Work Scope: Pipeline pre-survey, plan design, and site construction.
Previous: JZ9-3 Oil Field Submarine/Offshore Pipeline Laying Project (Year 2009-- CNOOC)
Next: Jidong Oil Field Nanpu No.1-3 Artificial Island Submarine/Offshore Pipeline Laying Project (Year 2009-- CNPC)