Project Introduction: This is the first submarine/offshore pipeline of PetroChina, bad sea conditions, big tide difference, rapid flow in construction site, pipeline route exposed during low tide.
Work Scope: 7.5km long subsea pipeline floating installation, pipeline landing, riser and spool installation, post-trenching, and hydrotesting.