Tanzania Mnazi Bay Submarine/Offshore Pipeline Shore Approach Laying Project (Year 2014-- CNPC)

Share:

Project Introduction: Part of gas pipeline crossing Mnazi Bay, shallow water area is 2.2km, total length is 16km.


Work Scope: Pipeline laying (float laying method), pre/post-trenching, pipeline pulling and landing.