Tanzania Mnazi Bay Submarine Pipeline Laying Project (Year 2014—CNPC)
Share:
Project Description:
Part of gas pipeline crossing Mnazi Bau, Shallow water area is 2.2km, total length is 5km. Work scope is pipeline laying (floating pulling method), pre/post-trenching, pipeline pulling and landing.