Yuedong Submarine Pipeline Laying Project (Year 2011~2012—Tincy Energy Group)

Share:

Project Description: 

Treatment terminal from artificial island to land, B-C, B-D Island, pipeline total length 38km. Pipeline laying (laybarge and floating pulling method), pre/post-trenching, backfilling, hydrotesting, 9 sets of riser and spool installation, landing, hydrotesting etc.