Project Description:
The external inspection of key hidden danger locations of the submarine pipeline completed in July 2024 revealed that parts of the pipelines and cables were suspended and exposed, with a total exposed length of 627.9m and 13.8m suspended, the maximum suspension is 0.9m.
Timeast work scope: using a vessel and supporting equipment to remediate the 13.8m suspended section by casting with 25kg sandbags.