Project Description:
Approximate 13km submarine/underwater cable laying (including landing installation at both ends), submarine/offshore cable connection at both ends, submarine/subsea cable inspection, hydrotesting work etc. High pressure hydraulic jet embedding machine (traction type) is adopted to carry out laying and burying at the same time. Bury depth is no less than 3 meters. By modification of equipment, Timeast met the construction quality requirements at one time and successfully completed the construction task, and achieved another breakthrough in technology.