Project Description:
The project is located at Puti Island, Laoting County, between Jingtang Port and Caofeidian Port, Tangshan City. The total installed capacity of the wind farm is 300MW, 75 units of Wind turbine generator with single capacity of 4MW. 12 circuits are arranged for 35kV power collection line cables among 75 units of Wind turbine generator, and a new 220kV offshore booster station is built by connecting 35kV submarine optic/electric composite cable to the site. Work Scope: the 220kV transmission ashore cables (3 sections, each is about 14210m in length, totaling 42.63km) and the 35kV power collection line cables (75 sections, each is 940m-6845m in length, totaling 112.685km) both are submarine optic/electric composite cable.