SAMALAJU PIPELINE EPCIC PROJECT Shore Approach Services (Year 2025- Huaxicun Offshore Engineering Services)

Share:


Project Description: 

The COMPANY proposed to construct a 24" submarine pipeline (Ø609.6×15.88, with concrete weight of 50mm from KP1.1 to KP60.8 and 125mm at both shore approach section) from MLNG in Bintulu to the Samalaju Industrial Park. The received gas at SIP will be utilized for the proposed CCGT power plant. The pipeline is from Take-Off Station 2 (TOS-2)in Kidurong Bintulu to Gas Receiving Facility(GRF)Samalaju Industrial Park. Main work scope: international procurement; site construction of both pipeline landfall sides; linear winch holdback anchor construction and auxiliary installation; cofferdam and rock berm construction; pre-trenching and backfilling; pipeline pulling and landing; site restoration; pre/post- survey etc.


SAMALAJU PIPELINE EPCIC PROJECT Shore Approach Services (Year 2025- Huaxicun Offshore Engineering Services)   SAMALAJU PIPELINE EPCIC PROJECT Shore Approach Services (Year 2025- Huaxicun Offshore Engineering Services)   SAMALAJU PIPELINE EPCIC PROJECT Shore Approach Services (Year 2025- Huaxicun Offshore Engineering Services)