[email protected]
+86 22 6670 4393
Project Description:
4.2km submarine/subsea pipeline post-trenching.
Previous: Jidong Oil Field 1-2 Island Submarine Pipeline Post Trenching Project (Year 2008—CNPC)
Next: Indonesia SES Gas Submarine Pipeline Pre Trenching Project (Year 2005—CNOOC)