[email protected]
+86 22 6670 4393
Project Description:
5km submarine/underwater pipeline post-trenching, with a diameter of 914mm (+100 mm concrete weight layer) and a burial depth of 1.5m.
Previous: Jidong Nanpu 1-29 Gas Storage Pilot Test Ground Engineering Injection Acquisition and Gathering Pipeline Project Lay Barge Construction Project (Year 2022—CNPC)
Next: Chenghai 1-1 Platform Submarine Pipeline/Cable Laying Project (Year 2021—CNPC)