Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Pipeline Pre/Post Trenching

Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022—CNPC)

Share:

Project Description:

5km submarine/underwater pipeline post-trenching, with a diameter of 914mm (+100 mm concrete weight layer) and a burial depth of 1.5m.


Pipeline Floating Pulling Installation and Supporting Auxiliary Works of        Qingdao Jiaozhou Bay Submarine/Offshore Natural Gas Pipeline Project (Year 2022-- CNPC)   Pipeline Floating Pulling Installation and Supporting Auxiliary Works of        Qingdao Jiaozhou Bay Submarine/Offshore Natural Gas Pipeline Project (Year 2022-- CNPC)   Pipeline Floating Pulling Installation and Supporting Auxiliary Works of        Qingdao Jiaozhou Bay Submarine/Offshore Natural Gas Pipeline Project (Year 2022-- CNPC)