Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Pipeline Pre/Post Trenching

Zhaodong Oil Field Submarine Pipeline Post Trenching Project (Year 2010—CNPC)

Share:

Project Description: 

10km submarine/underwater pipeline post-trenching, with a max pipeline diameter of 455mm and a burial depth of 1.5m.


Zhaodong Oil Submarine Pipeline Post-Trenching Project (Year 2010)Zhaodong Oil Submarine Pipeline Post-Trenching Project (Year 2010)