​Liaobin Submarine Waste Drainage Pipeline Laying Project (Year 2016—CNPC)

Share:

Project Description: 

The designed drainage quantity is 50,000 m3/d, pipeline total length 9.4km (DN1000), wall thickness: 15.9mm. Pipeline laying, landing, onshore valve well and pile installation, post-trenching and backfilling.