Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing

​Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016-- CNPC)

Share:

Project Introduction: The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9.4km (DN1000), wall thickness: 15.9mm.


Work Scope: Pipeline laying, landing, onshore valve well and pile installation, post-trenching and backfilling.


Liaobin Development Area Submarine Pollution Drainage Pipeline Laying Project (Year 2016)   Liaobin Development Area Submarine Pollution Drainage Pipeline Laying Project (Year 2016)   Liaobin Development Area Submarine Pollution Drainage Pipeline Laying Project (Year 2016)


Liaobin Development Area Submarine Pollution Drainage Pipeline Laying Project (Year 2016)   Liaobin Development Area Submarine Pollution Drainage Pipeline Laying Project (Year 2016)