Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Platform and Facilities Construction, Installation, Repairing

Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation (Tincy Energy Group)

Share:

Project Introduction: Jacket leg was seriously destroyed by ice fluent in winter, the new bumper breaks every year.


Work Scope: To solve the problem completely, Timeast re-design the structure, calculation and structure fabrication, offshore/subsea installation.


Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore Production Platform A1,A2,  Design, Fabrication and Site InstallationTincy Energy Group Yuedong Oil Filed, Bumper of Offshore Production Platform A1,A2,  Design, Fabrication and Site Installation