Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Platform and Facilities Construction, Installation, Repairing

CFD11-2 Offshore Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007~2008)

Share:

Project Description:

-Jumper Hose Parameter: ø 24''×55m

-Working Pressure: 139bar

-Jumper Cable Parameter: ø149mm×55m


-Visual Inspection and Performance Testing

-Transportation and Load and Sea Fastening

-Offshore/Subsea Installation


CFD11-2 Offshore Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)CFD11-2 Offshore Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)


CFD11-2 Offshore Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)CFD11-2 Offshore Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)