PetroChina Dagang Oil Field Chenghai 4X1 Submarine Pipeline Laying Project (Year 2007)

Apr. 24, 2007

Project Introduction: Max water depth is 3.5m during high tide, pipeline route exposed during low tide.

Work Scope: 4.2km long pipeline floating installation, pre/post-trenching, backfilling, pulling and landing, site service etc.


PetroChina Dagang Oil Field Chenghai 4X1 Submarine Pipeline Laying Project (Year 2007)