Project Introduction: Oil pipeline (ID 20”/26”) and water pipeline (10”+ cement weight), total length 7.6km.
Work Scope: Pipeline floating laying, pre/post-trenching, backfilling, pulling and landing, riser prefabrication, riser and spool installation, site service.