Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Project Case

PetroChina Jidong Nanpu Oil Field No. 1-2 Artificial Island Submarine Pipeline Laying Project (Year 2008)

Apr. 24, 2008

Project Introduction: Oil pipeline (ID 20”/26”) and water pipeline (10”+ cement weight), total length 7.6km.

Work Scope: Pipeline floating laying, pre/post-trenching, backfilling, pulling and landing, riser prefabrication, riser and spool installation, site service.


PetroChina Jidong Nanpu Oil Field No. 1-2 Artificial Island Submarine Pipeline Laying Project (Year 2008)

PetroChina Jidong Nanpu Oil Field No. 1-2 Artificial Island Submarine Pipeline Laying Project (Year 2008)