PetroChina Jidong Oil Field Nanpu No.1-3 Artificial Island Submarine Pipeline Laying Project (Year 2009)

Apr. 24, 2009

Project Introduction: Oil pipeline (14”/18”) and water pipeline (8”) installation, total length is 16km.

Work Scope: Pipeline floating laying, pre/post trenching, backfilling, landing, riser and spool installation, hydrotesting.