Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Project Case

Tanzania Mnazi Bay Submarine Pipeline Laying Project (Year 2014)

Apr. 24, 2019

Project Introduction: Gas pipeline crossing Mnazi Bay, total length 16km.

Work Scope: Pipeline laying (float laying method), pre/post-trenching, pipeline pulling and landing.


Tanzania Mnazi Bay Submarine Pipeline Laying Project (Year 2014)