Tanzania Songo Songo Island—Somanga Submarine Laying Project (Year 2013)

Apr. 24, 2019

Project Introduction: This is the first submarine pipeline in Tanzania, total length is 16km, 6km is shallow water area.

Work Scope: Pipeline laying (float laying method), pre/post-trenching, pipeline pulling and landing.