Project Introduction: Artificial island to land treatment terminal, pipeline total length 38km.
Work Scope: Pipeline laying (barge laying and float laying method), pre/post-trenching, backfilling, hydrotesting, 9 sets of riser and spool installation, landing, hydrotesting etc.