Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Oil & Gas Pipeline Laying and Repairing

Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022—CNPC)

Share:

Project Description

For Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project, the submarine pipeline section enters the sea from the west of Nugukou Bridge (short for "Entry Point") and ends at the sea-land connection point at the estuary of Licun River in Jiaozhou Bay (short for "landing point"). The total length of the submarine pipeline is 12.31km, the floating pulling length is 10.91km, the end point is about 1.4km from the landing point, and the maximum depth of route is 12.1m. The design pressure of pipeline is 4.0MPa, the diameter is 914mm, the thickness is 20.62mm, the material is X65MO, straight seam submerged arc welding pipe. The pipeline anti-corrosion layer is reinforced grade 3LPE, and the outside concrete counterweight layer thickness is 100mm and the density 3040kg/m3Work Scope: Obtain site use rights, complete site construction for floating pulling and welding. Install and remove the steel pipe piles along pipeline route. Position and install the 10.91km pipeline, offshore pipeline tie-in, including connection with the Horizontal Directional Drilling section and the bend at KP8.54, and 5km submarine pipeline post-trenching.


Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)     Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)     Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)


Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)   Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)   Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022— CNPC)