Project Description:
The project is located in about 30km east of Benin COTONOU Port in West Africa. Two parallel pipelines of about 14.4km long shall be laid from the landing end to the sea side. The offshore terminal is a single point mooring system of CALM type. TIMEAST is mainly responsible for the construction of two 28'' offshore pipelines, each is about 500m,Main work scope:Pulling Site Construction, Shore Approach
Submarine Pipeline Laying, Flooding, Post-trenching, Backfilling with Dredged Material, Site Reinstatement, etc.