NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project-Submarine Pipeline Shore Approach Laying Project (Year 2022— CNPC)

Share:

Project Introduction

The project is located in about 30km east of Benin COTONOU Port in West Africa. Two parallel pipelines of about 14.4km long will be laid from the landing end to the sea side. The offshore terminal is a single point mooring system of CALM type.


Work Scope:

TIMEAST is mainly responsible for the construction of two 28-inch offshore pipelines, each is about 500 meters. 

Main work scope:Pulling Site Construction, Shore Approach Submarine Pipeline Laying, Flooding, Post-trenching, Backfilling with Dredged Material, Site Reinstatement, etc.


NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project-Submarine Pipeline Shore Approach Laying Project (Year 2022—PetroChina)   NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project-Submarine Pipeline Shore Approach Laying Project (Year 2022—PetroChina)   NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project-Submarine Pipeline Shore Approach Laying Project (Year 2022—PetroChina)