Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Cable/Optical Cable Laying and Repairing

LD 5-2 Oil Field Cable Laying Project (Year 2007-- CNOOC)

Share:

Project Introduction: 4 subsea pipelines between platform. 9km long, 35kv.


Work Scope: Cable protection pipe and clip fabrication and installation, cable laying, cable connection with platform, cable pressure testing.


CNOOC LD 5-2 Oil Field Cable Laying (Year 2007)   CNOOC LD 5-2 Oil Field Cable Laying (Year 2007)   CNOOC LD 5-2 Oil Field Cable Laying (Year 2007)