CNOOC JZ9-3 Oil Field Cable Laying (Year 2009)

Share:

Project Introduction: 3 subsea pipelines between platform, 3.6km long, 10kv. 


Work Scope: Fabrication and installation of cable protection pipe and clip, cable laying, cable connection with platform, cable pressure testing. 