Tianjin Timeast Offshore Engineering Co., Ltd.
Home >> Our Services >> Submarine/Offshore Cable/Optical Cable Laying and Repairing

JZ9-3 Oil Field Cable Laying Project (Year 2009-- CNOOC)

Share:

Project Introduction: 3 subsea pipelines between platform, 3.6km long, 10kv. 


Work Scope: Cable protection pipe and clip fabrication and installation, cable laying, cable connection with platform, cable pressure testing. 


CNOOC JZ9-3 Oil Field Cable Laying (Year 2009)   CNOOC JZ9-3 Oil Field Cable Laying (Year 2009)   CNOOC JZ9-3 Oil Field Cable Laying (Year 2009)