[email protected]
+86 22 6670 4393
Project Introduction: P6-CEP broke subsea cable need to be repaired emergently.
Work Scope: Subsea cable searching and salvage, fault point searching, checking, repairing and pressure testing.
Previous: Zhaodong Oil Field Cable Repairing Project (Year 2012-- Roc Oil)
Next: JZ9-3 Oil Field Cable Laying Project (Year 2009-- CNOOC)