[email protected]
+86 22 6670 4393
Project Description:
1km submarine/subsea pipeline post-trenching, with a burial depth of 2m.
Previous: CFD Industrial Area Submarine Drainage Pipeline Laying Project (Year 2020—Tangshan CFD Yongtai Industrial Co., Ltd.)
Next: Submarine Pipeline Post Trenching Project of Jidong Oil Field NP1-1D and Its Energy Saving & Low-carbon Demonstration Area Construction Project(Year 2023—CNPC)