Submarine Pipeline Post Trenching Project of Jidong Oil Field NP1-1D and Its Energy Saving & Low-carbon Demonstration Area Construction Project(Year 2023—CNPC)
Share:
Project Description:
2.2km submarine/subsea pipeline post-trenching, with a diameter of 323.8mm and a burial depth of 2m.