Project Introduction: Onshore pipeline 0.2km, offshore pipeline 1.37km.
Work Scope: Pipeline procurement, anticorrosion, subsea pipeline and pile installation, pre-trenching, backfilling, hydrotesting.
Previous: Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017~2018—Jiangsu Power Design Institute Co., Ltd.)
Next: Liaobin Submarine Waste Drainage Pipeline Laying Project (Year 2016—CNPC)