Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Our Services
>>
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Dalian Offshore/Submarine Cable Laying Project (Year 2020—Hengtong Offshore Engineering Co., Ltd)
Construction and protection of offshore/subsea from the landing point to designated position, including joint casing procurement and installation.
View More
Tangshan Laoting Puti Island Offshore Wind Farm 300MW Demonstration Project 35kV Submarine Photoelectric/Optical Composite Cable Laying Project (Year 2019—Hen
The project is located at Puti Island, Laoting County, between Jingtang Port and Caofeidian Port, Tangshan City. The total installed capacity of the wind farm is 300MW, 75 units of Wind turbine generator with single capacity of 4MW.
View More
Yuedong Oil Field Submarine Cable Exposing Repairing Project (Year 2019—Tincy Energy Group)
Since the production of Yuedong oil field submarine pipelines/cables in Oct., 2013, burial depth investigations on the submarine pipelines/cables and route had been carried out in 2014, 2016 and 2018 respectively. Emergency management work had been carried out on several suspended and exposed su...
View More
Huludao Submarine Optical Cable Laying Project (Year 2017—Huludao Juehuadao Tourism Administration)
Approximate 13km submarine/underwater cable laying (including landing installation at both ends), submarine/offshore cable connection at both ends, submarine/subsea cable inspection, hydrotesting work etc.
View More
Yuedong Oil Field Submarine Cable Repairing Project (Year 2014—Tincy Energy Group)
Yuedong Oil Field, A and B cable between Island and onshore broke and need to be repaired emergently. Cable searching, fault point searching and checking, cable salvage, fault point repairing and pressure testing.
View More
Previous
1
2
3
Next