Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Our Services
>>
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018—CNOOC)
Abandoned 8'' mixed transportation pipeline and 12'' natural gas submarine pipeline of Boxi treatment plant, dismantled and recycled 600m section through the channel section of Gaoshaling port area, both ends in-situ sealing, pipeline ends sealing treatment; Abandoned 8'' mixed transportation pi...
View More
Ma Mu & Yu Shan Islands Submarine Pipelines Installation Project (Year 2018—CNOOC)
Horizontal Pipe Lifting; Inclined Riser Integrally Lifting and Overall Lower Down Work after Tie-In; Two Crude Oil Submarine Pipelines, One Natural Gas Pipeline Landing Point 150m Long Trench Flushing Work.
View More
Weizhou 12-2 Oil Field Phase Ⅱ Development Project (Year 2016—Guangzhou Salvage Bureau of the Ministry of Transport)
Measurement, prefabrication and installation of submarine pipeline expansion bend, damaged flat pipe section cutting, replaced flat pipe section prefabrication and installation.
View More
Tanzania Mnazi Bay Submarine Pipeline Laying Project (Year 2014—CNPC)
Part of gas pipeline crossing Mnazi Bau, Shallow water area is 2.2km, total length is 5km. Work scope is pipeline laying (floating pulling method), pre/post-trenching, pipeline pulling and landing.
View More
Tanzania Songo Songo Island—Somanga Submarine Pipeline Shore Approach Laying Project (Year 2013—CNPC)
This is the first submarine pipeline in Tanzania, total length is 28km, 6km is shallow water area. Work scope is Pipeline laying (floating pulling method), pre/post-trenching, pipeline pulling and landing.
View More