Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post-Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Excavator
SE-18000 Excavator
Submarine/Offshore Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post-Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Excavator
SE-18000 Excavator
Submarine/Offshore Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Our Services
>>
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018-- CNOOC)
Abandoned 8” mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment plant, dismantled and recycled 600m section through the tunnel section of Gaoshaling port area, dismantled and recycled 150m section through the breakwater, both ends on site sealing, pi...
View More
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018-- CNOOC)
Horizontal pipe lifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarine pipelines, One natural gas pipeline landing point 150m long trench flushing work.
View More
Weizhou 12-2 Oilfield Phase Ⅱ Development Project (Year 2016-- Guangzhou Salvage Bureau of the Ministry of Transport)
Measurement, prefabrication and installation of submarine pipeline expansion bend, damaged flat pipe section cutting, replaced flat pipe section prefabrication and installation.
View More
Tanzania Mnazi Bay Submarine/Offshore Pipeline Shore Approach Laying Project (Year 2014-- CNPC)
Part of gas pipeline crossing Mnazi Bay, shallow water area is 2.2km, total length is 16km.
View More
Tanzania Songo Songo Island—Somanga Submarine/Offshore Pipeline Shore Approach Laying Project (Year 2013-- CNPC)
This is the first submarine/offshore pipeline in Tanzania, total length is 28km, 6km is shallow water area.
View More
Previous
1
2
3
4
Next