Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Our Services
>>
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Yuedong Oil Field Submarine Pipeline Exposing & Suspending Repairing Project (Year 2024—Tincy Energy Group)
The external inspection of key hidden danger locations of the submarine pipeline completed in July 2024 revealed that parts of the pipelines and cables were suspended and exposed, with a total exposed length of 627.9m and 13.8m suspended, the maximum suspension is 0.9m. Timeast work scope: using ...
View More
Jidong Nanpu 1-29 Gas Storage Pilot Test Ground Engineering Injection Acquisition and Gathering Pipeline Project Lay Barge Construction Project (Year 2022—CNPC
Providing S-Lay Barge TIAN YI 601 as the main operation vessel for 3.31km pipeline laying, 1 riser and spool installation, 3.31km post-trenching and exposed submarine/offshore pipelines/cables repairing.
View More
Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022—CNPC)
For Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project, the submarine pipeline section enters the sea from the west of Nugukou Bridge (short for "Entry Point") and ends at the sea-land connection point at the estuary of Licun River in Jiaozhou Bay (short for "landing point"...
View More
NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project- Submarine Pipeline Shore Approach Laying Project (Year 2022—CNPC)
The project is located in about 30km east of Benin COTONOU Port in West Africa. Two parallel pipelines of about 14.4km long shall be laid from the landing end to the sea side.
View More
Yuedong Oil Field Offshore Pipeline Exposing & Suspending Repairing Project (Year 2021—Tincy Energy Group)
In the external inspection performed in July 2021 to submarine pipeline & cables, part of submarine pipes and cables were found suspended and exposed, there are 13 exposed points of submarine pipelines with a length of 1235.9m, among them, 7 suspended points with a length of 368.9m, and the maximu...
View More
Previous
1
2
3
4
Next