Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
[email protected]
+86 22 6670 4393
Home
About Timeast
Company Overview
Our History
Our Culture
Honors & Qualification
Main Achievements
Our Services
Submarine/Offshore Oil & Gas Pipeline Laying and Repairing
Submarine/Offshore Pollution Drainage & Water Transportation Pipeline Laying and Repairing
Submarine/Offshore Cable/Optical Cable Laying and Repairing
Submarine/Offshore Pipeline Landing
Submarine/Offshore Platform and Facilities Construction, Installation, Repairing
Submarine/Offshore Pipeline Pre/Post Trenching
Equipments
S-Lay Barge TIAN YI 601
SE-12000 Trenching Machine
SE-18000 Trenching Machine
Submarine Cable/Optical Cable Laying Equipment
Cable Testing and Repairing
Underwater Cold Cutting Equipment for Submarine Pipelines and Structures
Press
News
Activities
Industry Trends
Contact Us
Home
About Us
Services
Contacts
Home
>>
Our Services
>>
Submarine/Offshore Pipeline Pre/Post Trenching
Submarine Pipeline Post Trenching Project of Jidong Oil Field NP1-1D and Its Energy Saving & Low-carbon Demonstration Area Construction Project(Year 2023—CNPC)
2.2km submarine/subsea pipeline post-trenching, with a diameter of 323.8mm and a burial depth of 2m.
View More
Jidong Nanpu 1-29 Gas Storage Pilot Test Ground Engineering Injection Acquisition and Gathering Pipeline Project Lay Barge Construction Project (Year 2022—CNPC)
3.31km submarine/offshore pipeline post-trenching.
View More
Pipeline Floating Pulling Installation and Supporting Auxiliary Works of Qingdao Jiaozhou Bay Submarine Natural Gas Pipeline Project (Year 2022—CNPC)
5km submarine/underwater pipeline post-trenching, with a diameter of 914mm (+100 mm concrete weight layer) and a burial depth of 1.5m.
View More
NIGER to BENIN Offshore Terminal of Crude Oil Export Pipeline Project-Submarine Pipeline Shore Approach Laying Project (Year 2022—CNPC)
1km submarine/subsea pipeline post-trenching, with a burial depth of 2m.
View More
Chenghai 1-1 Platform Submarine Pipeline/Cable Laying Project (Year 2021—CNPC)
1.2km submarine/offshore pipeline pre-trenching, 4.8km submarine/offshore pipeline post-trenching; 2.92km submarine/offshore cable post-trenching (shallow water), 6.4km submarine/offshore cable post-trenching(deep water).
View More
Previous
1
2
3
4
Next